Local Plan documents, assessments and evidence
Overview
This page includes all our documentation and supporting evidence used for producing the draft Local Plan.
Consultation takes place between Monday 20 June and Sunday 14 August 2022. Read more about how you can have your say on the Local Plan.
We have also produced some frequently asked questions about the Local Plan, which may help if you have any questions about it.
Key documents
Local Plan
Draft Local Plan 2021 to 2039 (published June 2022)
Local Plan Policies Map
Draft Local Plan Policy Map (published June 2022)
Other key Local Plan documents
Local Plan Sustainability Report (June 2022)
Annex 1 Site Options Sustainability Appraisal Matrices
Local Plan Sustainability Appraisal: Non Technical Summary
Habitats Regulations Assessment (June 2022)
Statement of Representations Procedure (published June 2022)
Local Development Scheme (published June 2022)
Evidence Papers
Housing Evidence
Strategic Housing Market Assessment
Strategic Housing Land Availability Assessment 2022
Stage 1 Green Belt Review Exceptional Circumstances 2022
Stage 2 Green Belt Review Site Assessments
South Tyneside Site Frameworks (2022)
Gypsy and Traveller and Travelling Showperson Accommodation Assessment 2021
Economic Evidence
Employment Land Technical Paper
South Tyneside Economic Assessment (Dec 2021)
Town Centre and District Centre Use Study (2018)
Natural Environment Evidence
Strategic Flood Risk Assessment 2022
Strategic Flood Risk Assessment 2022: Detailed Maps
Wildlife Corridors Review 2020
Playing Pitch Mitigation - Site Search Methodology
South Tyneside Playing Pitch Strategy (2019)
South Tyneside and Sunderland Coast Visitor Survey Analysis (Jan 2021)
The Air Quality Annual Status Report (June 2020)
Wader Survey - South Tyneside (2020)
Open Space Update Addendum (2019)
South Tyneside Open Space Assessment Report (2015)
South Tyneside Open Space Standards Paper (2015)
Coastal Designation Justification (2022)
Climate Change Evidence
South Tyneside Carbon Audit (2021)
Infrastructure and Viability Evidence
Infrastructure Delivery Plan (2022)
Large Greenbelt Release Accessibility Report 2021
Large Greenbelt Release - Aimsun Testing 2021
A194 / A184 White Mare Pool Emerging Pressures - White Mare Pool Junction Study (December 2021)
Local Plan Viability Testing (Dec 2021)
Local Plan Viability Testing: Appendices 1-9
Local Plan Viability Testing: Appendix 10
Local Plan Viability Testing: Appendices 11 - 21
Joint Local Aggregates Assessment (April 2022)