| medium |
A1290 Washington Road Slip Roads East And West Of A19 |
lane closures for remedial works within Sunderland borough |
Roadworks |
26/07/2026 8:00am |
08/08/2026 4:30pm |
South Tyneside Council |
| medium |
Abingdon Way |
Junction upgrade. Kerbs, signals, footways and carriageways, with temp lights in place |
Roadworks |
27/04/2026 8:00am |
18/12/2026 5:00pm |
South Tyneside Council |
| medium |
Access Road To 75-117 Newcastle Road, South Tyneside |
Lay 142m x 63pe main |
Roadworks |
03/08/2026 12:00am |
14/08/2026 11:59pm |
Northern Gas Networks |
| medium |
Access Road To 75-117 Newcastle Road, South Tyneside |
Lay 142m x 63pe main in the private |
Roadworks |
03/08/2026 12:00am |
14/08/2026 11:59pm |
Northern Gas Networks |
| medium |
Access Road To Calf Close House, South Tyneside |
Rectify reinstatement defect |
Roadworks |
03/08/2026 12:00am |
04/08/2026 1:00am |
BT |
| high |
Addison Road, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
05/08/2026 9:30am |
06/08/2026 3:30pm |
South Tyneside Council |
| medium |
Albert Road |
install 2 way duct Complete half road crossing approx 4mtrs cw and 2mtrs fw |
Roadworks |
30/07/2026 8:00am |
03/08/2026 5:00pm |
Grain Communications Ltd |
| medium |
Albert Road |
Install 1 way and 2 way duct after re design approx 15mtrs cw and 8mtrs fw |
Roadworks |
30/07/2026 8:00am |
03/08/2026 5:00pm |
Grain Communications Ltd |
| high |
Alnwick Grove, South Tyneside |
carry out a concrete bay renewal and resurfacing |
Diversion route / Road closure |
12/08/2026 8:00am |
28/08/2026 5:00pm |
South Tyneside Council |
| medium |
Ashley Road |
Clear two blockages in the carriageway |
Roadworks |
31/07/2026 12:00am |
04/08/2026 11:59pm |
Virgin Media |
| medium |
Bede Burn View |
Low Voltage Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavation – Customers off supply |
Roadworks |
27/07/2026 5:30pm |
05/08/2026 11:59pm |
Northern Powergrid |
| medium |
Beresford Avenue |
concrete bay renewal programme 2026 27 |
Roadworks |
20/07/2026 8:00am |
31/07/2026 5:00pm |
South Tyneside Council |
| medium |
Blyton Avenue |
abandon 10m of 4" SI and lay 10m of 90mm LP PE - insertion works |
Roadworks |
27/07/2026 7:30am |
14/08/2026 11:59pm |
Northern Gas Networks |
| medium |
Boker Lane, South Tyneside |
USSL utilities to rectify S81 |
Roadworks |
12/08/2026 12:00am |
14/08/2026 11:59pm |
Northern Gas Networks |
| medium |
Brockley Avenue |
Maintenance Excavation on the F/W to Install a New
BT Duct from F/W Chamber to End Customer to provide new fibre service. 31Mtrs F/W Duct. |
Roadworks |
27/07/2026 9:13am |
30/07/2026 1:00am |
BT |
| medium |
Calf Close Lane, South Tyneside |
Client visit to complete telecoms pole installation. Rigging, testing and integration to follow when the pole is landed to ensure the site is operating correctly. |
Roadworks |
03/08/2026 12:00am |
08/08/2026 11:59pm |
Hutchison 3G Ltd |
| high |
Campbell Park Road, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
30/07/2026 8:00am |
31/07/2026 6:00pm |
South Tyneside Council |
| high |
Coast Road |
construct a concrete pad in verge outside of pub in verge and alter kerb line on the lees side of the road |
Roadworks |
27/07/2026 8:00am |
31/07/2026 5:00pm |
South Tyneside Council |
| medium |
Commercial Road |
Excavate in footway/ carriageway, approx. 20m, for double road crossing, to install new underground electric cable, joint cable and make new connections. |
Roadworks |
06/08/2026 12:00am |
19/08/2026 11:59pm |
Northern Powergrid |
| medium |
Commercial Road |
Excavate in footway/ carriageway, approx. 20m, for double road crossing, to install new underground electric cable, joint cable and make new connections. |
Roadworks |
06/08/2026 12:00am |
17/08/2026 11:59pm |
Northern Powergrid |
| high |
Crawley Avenue, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
09/08/2026 8:00am |
09/08/2026 6:00pm |
South Tyneside Council |
| medium |
Didcot Way |
Junction upgrade. Kerbs, signals, footways and carriageways, temp lights in place |
Roadworks |
27/04/2026 8:00am |
18/12/2026 5:00pm |
South Tyneside Council |
| medium |
Dillon Street |
Excavate in fw and cw to install 1 way and 2 way duct and swep tees with tobies install new under ground chambers approx 60 mtrs fw and 5mtrs cw |
Roadworks |
02/07/2026 12:00pm |
30/07/2026 5:00pm |
Grain Communications Ltd |
| medium |
Dipe Lane, South Tyneside |
Remedial works following Excavate on existing valve chamber to renew cover. |
Roadworks |
03/08/2026 12:00am |
14/08/2026 11:59pm |
Northumbrian Water |
| medium |
Dukes Avenue |
Install 5m of 1 way poly duct in Concrete Carriageway, Install 3m of 1 way poly duct in Footway |
Roadworks |
27/07/2026 12:00am |
07/08/2026 1:00am |
BT |
| medium |
East Drive, South Tyneside |
Excavate on existing boundary box to renew boundary box. |
Roadworks |
28/07/2026 11:15am |
03/08/2026 11:59pm |
Northumbrian Water |
| medium |
East View |
Remedial works to correct Ha defect - re-work road crossing |
Roadworks |
28/07/2026 8:39am |
30/07/2026 11:59pm |
BT |
| medium |
Elmfield Road, South Tyneside |
DR4 mains investigation to determine start and end location, dimensions and depth of pipe |
Roadworks |
22/07/2026 9:13am |
05/08/2026 11:59pm |
Northern Gas Networks |
| medium |
Ewart Crescent |
Fuse upgrade - Excavate in footway x 1 joint bay to alter and upgrade existing services. Backfill and reinstate excavation |
Roadworks |
30/07/2026 12:00am |
05/08/2026 11:59pm |
Northern Powergrid |
| high |
Falmouth Drive, South Tyneside |
carry out a concrete bay renewal |
Diversion route / Road closure |
03/08/2026 8:00am |
12/08/2026 5:00pm |
South Tyneside Council |
| high |
Frederick Street, South Tyneside |
replace a telegraph pole |
Diversion route / Road closure |
29/07/2026 8:30am |
30/07/2026 1:00am |
BT |
| medium |
Gerald Street |
Excavate and install 56m of 300 wne for electric connection to EVC point |
Roadworks |
21/07/2026 8:00am |
03/08/2026 5:00pm |
Global Utility Connections |
| medium |
Gerald Street |
Excavate and install 3ph service to new ev charger |
Roadworks |
10/08/2026 8:00am |
21/08/2026 4:30pm |
Global Utility Connections |
| medium |
Gosforth Avenue |
Excavate and install 11m of 300 wne electric cable for EVC connection |
Roadworks |
21/07/2026 8:00am |
03/08/2026 5:00pm |
Global Utility Connections |
| medium |
Gosforth Avenue |
Excavate and install new 3ph service to ev charger on Gerald St. |
Roadworks |
10/08/2026 8:00am |
21/08/2026 4:30pm |
Global Utility Connections |
| medium |
Green Lane |
2 potholes one at speedbump and other at gully |
Roadworks |
30/07/2026 8:00am |
03/08/2026 5:00pm |
South Tyneside Council |
| medium |
Green Lane, South Tyneside |
pothole in carriageway |
Roadworks |
30/07/2026 8:00am |
03/08/2026 5:00pm |
South Tyneside Council |
| medium |
Greenbank |
Excavate and install 68m of 95wne electric cable for EVC Charger |
Roadworks |
20/07/2026 8:00am |
31/07/2026 5:00pm |
Global Utility Connections |
| high |
Hebn 14, South Tyneside |
install a new service connection |
Footway closure |
03/08/2026 8:00am |
07/08/2026 4:00pm |
South Tyneside Council |
| high |
Hedgeley Road, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
10/08/2026 9:30am |
12/08/2026 3:30pm |
South Tyneside Council |
| high |
Hedworth Lane, South Tyneside |
repair a gas escape |
Diversion route / Road closure |
28/07/2026 12:00am |
31/07/2026 11:59pm |
Northern Gas Networks |
| high |
Hedworth Lane, South Tyneside |
Attend, Excavate and Repair Gas Escape |
Roadworks |
22/07/2026 11:00am |
31/07/2026 11:59pm |
Northern Gas Networks |
| medium |
Highfield Road, South Tyneside |
Remedial works after defect received |
Roadworks |
28/07/2026 10:00am |
03/08/2026 11:59pm |
Northumbrian Water |
| high |
Hubert Street, South Tyneside |
carry out maintenance on a sensor within a chamber - 09:00a.m - 15:00p.m |
Diversion route / Road closure |
05/08/2026 12:00am |
05/08/2026 11:59pm |
Northumbrian Water |
| medium |
Hutton Row |
Urgent structural repairs required to cemetery wall therefore footway closure required along with 3no of parking bays directly alongside the cemetery wall for public safety |
Roadworks |
04/06/2026 10:00am |
04/09/2026 5:00pm |
South Tyneside Council |
| medium |
Ladysmith Street |
NR Patching works 08/06/2026-08/06/2026 08:00-18:00 3 way lights on junction of Mozart Street |
Roadworks |
06/08/2026 8:00am |
06/08/2026 6:00pm |
South Tyneside Council |
| medium |
Leam Lane |
Lane closures with switching for Street lighting works on A194M Whitemarepool Roundabout |
Roadworks |
15/06/2026 7:40pm |
10/09/2026 6:00am |
National Highways |
| medium |
Leam Lane |
renew pedestrian barriers after rta |
Roadworks |
04/08/2026 9:30am |
05/08/2026 3:00pm |
South Tyneside Council |
| medium |
Leam Lane |
Lane closures with switching for Street lighting works on A194M Whitemarepool Roundabout |
Roadworks |
15/06/2026 8:00pm |
12/09/2026 6:00am |
National Highways |
| medium |
Loudon Street, South Tyneside |
Reconnect gas supply |
Roadworks |
24/07/2026 9:00am |
30/07/2026 11:59pm |
Northern Gas Networks |
| medium |
Marine Drive |
Jetting and cleansing culvert. |
Roadworks |
12/08/2026 7:30am |
14/08/2026 4:00pm |
Network Rail Infrastructure Ltd |
| medium |
Marine Drive |
Parking of vehicles & possible excavation (432314 , 563249) to carry out sewer repairs within verge |
Roadworks |
27/07/2026 9:07am |
31/07/2026 11:59pm |
Northumbrian Water |
| medium |
Marsden Lane |
Remedial Works - Repair the concrete in the carriageway backfill & reinstate excavation. |
Roadworks |
29/07/2026 9:40am |
11/08/2026 11:59pm |
Northern Powergrid |
| medium |
Marsden Lane |
SOUTH SHIELDS 1254734 - REMEDIAL WORKS - to clear Highway Defect |
Roadworks |
29/07/2026 8:59am |
11/08/2026 1:00am |
BT |
| medium |
Mill Lane |
Mains are laid in position ready for excavating 2 joint bays, testing the mains, connecting the mains backfill and reinstate. |
Roadworks |
20/07/2026 8:00am |
31/07/2026 5:00pm |
South Tyneside Council |
| medium |
Napier Street |
Excavate and install 34m of 35cne electric cable for EVC at Napier Street Car Park |
Roadworks |
20/07/2026 8:00am |
31/07/2026 5:00pm |
Global Utility Connections |
| medium |
New Road |
Excavate to replace 2 damaged manhole cover and frame that is cracked |
Roadworks |
30/07/2026 12:00am |
30/07/2026 11:59pm |
Northumbrian Water |
| medium |
New Road, South Tyneside |
Excavate to replace a damaged manhole cover and frame that is buried |
Roadworks |
03/08/2026 12:00am |
03/08/2026 11:59pm |
Northumbrian Water |
| medium |
Newcastle Road |
Lane closures with switching for Street lighting works on A194M Whitemarepool Roundabout |
Roadworks |
15/06/2026 8:00pm |
12/09/2026 6:00am |
National Highways |
| medium |
Newcastle Road |
Lane closures with switching only for Street lighting works on A194M Whitemare Pool Roundabout |
Roadworks |
15/06/2026 7:40pm |
10/09/2026 6:00am |
National Highways |
| medium |
Newcastle Road |
A194M / A184 Whitemarepool Roundabout - Lane closures with switching for National Highways streetlighting works. |
Roadworks |
15/06/2026 8:00pm |
12/09/2026 6:00am |
National Highways |
| medium |
Newcastle Road |
A194M / A184 Whitemarepool Roundabout - Lane closures with switching for National Highways streetlighting works. |
Roadworks |
15/06/2026 7:40pm |
10/09/2026 6:00am |
National Highways |
| medium |
Norham Avenue North |
Excavate in footway and carriageway approx 150m including x2 road crossings in conjunction with works on Norham Avenue South to install new underground electric cable. Joint new cable and make connections. |
Roadworks |
27/07/2026 12:00am |
31/08/2026 11:59pm |
Northern Powergrid |
| medium |
Norham Avenue South |
Excavate in footway and verge approx 100m to install new underground electric cable in conjunction with works on Norham Avenue North. Joint new cable and make connections. |
Roadworks |
27/07/2026 12:30pm |
31/08/2026 11:59pm |
Northern Powergrid |
| medium |
Norham Avenue South |
Excavate in footway and verge approx 100m to install new underground electric cable in conjunction with works on Norham Avenue North. Joint new cable and make connections. |
Roadworks |
27/07/2026 12:30pm |
31/08/2026 11:59pm |
Northern Powergrid |
| medium |
North Road |
Remedial works - as laid |
Roadworks |
28/07/2026 8:35am |
30/07/2026 6:00pm |
BT |
| high |
North Road, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
04/08/2026 8:00am |
06/08/2026 6:00pm |
South Tyneside Council |
| high |
Ocean Road |
road closure required for the Ocean Rd Mela event |
Roadworks |
09/08/2026 11:30am |
09/08/2026 6:30pm |
South Tyneside Council |
| high |
Ocean Road, South Tyneside |
Indian fair taking place on Ocean Road |
Entertainment event / Public event - Entertainment event / Road closure |
09/08/2026 11:30am |
09/08/2026 6:30pm |
South Tyneside Council |
| high |
Owen Drive, South Tyneside |
renew a concrete bay |
Diversion route / Road closure |
20/07/2026 8:00am |
21/08/2026 5:00pm |
South Tyneside Council |
| medium |
Penshaw View, South Tyneside |
to rectify reinstatement defect |
Roadworks |
03/08/2026 12:00am |
04/08/2026 1:00am |
BT |
| high |
Perth Green, South Tyneside |
facilitate the construction of a residential development |
Diversion route / Road closure |
06/08/2026 8:00am |
10/09/2026 6:00pm |
South Tyneside Council |
| high |
Rear Of Arnold Street And North Road, South Tyneside |
carry out remedial works |
Diversion route / Road closure |
10/08/2026 12:00am |
13/08/2026 11:59pm |
Northumbrian Water |
| medium |
Rear Of Glen Street, South Tyneside |
new electric connection to the newly built care facility |
Roadworks |
27/07/2026 8:00am |
31/07/2026 5:00pm |
South Tyneside Council |
| medium |
Rear Of Horsley Hill Road, South Tyneside |
Customer request meter.Excavate on existing stop tap and adjacent service to renew with boundary box and meter. |
Roadworks |
07/08/2026 12:00am |
13/08/2026 11:59pm |
Northumbrian Water |
| high |
Rear Of Milton Street And Union Street, South Tyneside |
build a concrete chamber |
Diversion route / Road closure |
28/07/2026 12:14pm |
10/08/2026 1:00am |
BT |
| high |
Rear Of Milton Street And Union Street, South Tyneside |
Demolish 1 existing jointbox(s) or cabinet base(s) and Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway |
Roadworks |
27/07/2026 12:00am |
07/08/2026 1:00am |
BT |
| medium |
Rear Of Mowbray Road And St Vincent Street, South Tyneside |
Leakage. Excavate on existing boundary box and fittings to renew due to leak. |
Roadworks |
28/07/2026 10:38am |
03/08/2026 11:59pm |
Northumbrian Water |
| medium |
Rear Of Pine Street |
Carry out defect works |
Roadworks |
30/07/2026 8:00am |
30/07/2026 5:00pm |
Grain Communications Ltd |
| medium |
Red House Road |
L/A DEFECTS FULL ROAD VARIOUS LOCATIONS LIFT AND RELAY FLAGS AS AGREED FILLETS TO RENEW AS AGREED ON SITE |
Roadworks |
31/07/2026 8:00am |
04/08/2026 5:00pm |
Grain Communications Ltd |
| medium |
Rede Street |
Excavate in fw and cw to install 1 way and 2 way duct and swep tees with tobies install new under ground chambers approx 10mtrs fw and approx 21mtrs cw |
Roadworks |
27/07/2026 8:00am |
16/08/2026 5:00pm |
Grain Communications Ltd |
| medium |
River Drive |
make safe with a view to repair retaining wall |
Roadworks |
17/06/2026 10:30am |
02/04/2027 5:00pm |
South Tyneside Council |
| high |
River Drive, South Tyneside |
River Drive, South Shields |
Diversion route / Road closure |
13/11/2025 2:00pm |
31/08/2026 5:00pm |
South Tyneside Council |
| high |
Roman Road, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
03/08/2026 8:00am |
03/08/2026 6:00pm |
South Tyneside Council |
| high |
Sea Road |
Excavate and install new 3ph service to ev chargeres in south prom car park |
Roadworks |
10/08/2026 8:00am |
21/08/2026 4:30pm |
Global Utility Connections |
| high |
St Gregorys Court, South Tyneside |
carry out telecom mast maintenance |
Diversion route / Road closure |
30/07/2026 12:00am |
31/07/2026 11:59pm |
O2 (UK) Limited |
| medium |
St Johns Avenue |
Ground mounted HV switchgear replacement and HV cabling replacement as part of NPG sub station refurbishment. Excavation in the footway only, carriageway space required for generator placement. |
Roadworks |
07/08/2026 12:00am |
14/08/2026 11:59pm |
Northern Powergrid |
| high |
St Johns Avenue, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
27/07/2026 8:00am |
31/07/2026 6:00pm |
South Tyneside Council |
| medium |
Suffolk Street |
Excavate in fw and cw to install 1 way and 2 way duct and swep tees with tobies install new under ground chambers approx 140mtrs fw and approx 17mtrs cw |
Roadworks |
05/08/2026 8:00am |
18/08/2026 5:00pm |
Grain Communications Ltd |
| medium |
Suffolk Street |
Excavate in fw and cw to install 1 way and 2 way duct and swep tees with tobies install new under ground chambers approx 140mtrs fw and approx 17mtrs cw |
Roadworks |
10/07/2026 8:00am |
06/08/2026 5:00pm |
Grain Communications Ltd |
| high |
Summerhill Road |
concrete bay renewal programme 2026/27, (3 sections) |
Roadworks |
27/07/2026 8:00am |
07/08/2026 5:00pm |
South Tyneside Council |
| high |
Summerhill Road, South Tyneside |
carry out a concrete bay renewal |
Diversion route / Road closure |
27/07/2026 8:00am |
07/08/2026 5:00pm |
South Tyneside Council |
| high |
Sunderland Road |
|
Roadworks |
10/08/2026 9:30am |
10/08/2026 2:30pm |
South Tyneside Council |
| high |
Sunderland Road |
carriageway resurfacing |
Roadworks |
10/08/2026 8:00am |
10/08/2026 6:00pm |
South Tyneside Council |
| high |
Sunderland Road, South Tyneside |
resurface the carriageway - 09:30a.m - 14:30p.m |
Diversion route / Road closure |
10/08/2026 9:30am |
10/08/2026 2:30pm |
South Tyneside Council |
| medium |
The Hawthorns, South Tyneside |
Remedial works following Renew service due to lead content.Excavate to an approximate depth of 750mm on main and customer's boundary to renew connections, install new chamber and lay new pipe between main and boundary by open cut or thrustbore where possible. |
Roadworks |
04/08/2026 12:00am |
06/08/2026 11:59pm |
Northumbrian Water |
| medium |
Thirlmere Court |
Fuse Upgrade - 1 x Joint Bay in the footway backfill & reinstate excavation. |
Roadworks |
26/07/2026 5:30pm |
04/08/2026 11:59pm |
Northern Powergrid |
| medium |
Throckley Way |
3 bitmac patches |
Roadworks |
30/07/2026 8:00am |
03/08/2026 5:00pm |
South Tyneside Council |
| high |
Tracey Avenue, South Tyneside |
renew a concrete bay |
Diversion route / Road closure |
20/07/2026 8:00am |
21/08/2026 5:00pm |
South Tyneside Council |
| medium |
Wagonway Road |
Topographical survey to the area - No Excavation |
Roadworks |
04/08/2026 12:00am |
05/08/2026 11:59pm |
Northumbrian Water |
| medium |
Wansbeck Road |
Excavate in fw and cw to install 1 way and 2 way duct and swep tees with tobies install new under ground chambers approx 780mtrs fw 18mtrs cw |
Roadworks |
07/07/2026 9:09am |
17/08/2026 5:00pm |
Grain Communications Ltd |
| high |
West Parade, South Tyneside |
resurface the carriageway |
Diversion route / Road closure |
28/07/2026 8:00am |
31/07/2026 6:00pm |
South Tyneside Council |
| high |
Witney Way |
road closure required for junction upgrade. Kerbs, signals, footways and carriageways |
Roadworks |
27/04/2026 8:00am |
18/12/2026 5:00pm |
South Tyneside Council |
| high |
Witney Way, South Tyneside |
carry out a junction upgrade |
Diversion route / Road closure |
27/04/2026 12:00am |
07/08/2026 11:59pm |
South Tyneside Council |